NAFTA Well Services offers expert rescue and research services
Slickline & Wireline
NAFTA Well Services provide slickline/wireline services with 2 truck units and staff of 4 operators and one slickline engineer with IWCF Certificates.
Track units parameters:
Iveco EuroCargo tector 4x4
Built with technology from Leutert in Germany (2003)
- slicklines – carbon steel 2,08 mm and 2,34 mm, stainless 2,34 mm
- max depth to 6 km
- max load on winch 0,5 t, max load on listed lines 1100 kg
- detachable slickline drum
MAN 13.250 4x4
Built with technologies LogIn and CanadaTech in Germany (2009)
- slickline – carbon steel 2,74 mm
- max depth to 6 km
- max load on winch 2 t, max load on listed line 450 kg
- cable monoconductor 7/32“ for downhole online pressure and temperature measuring
Typical provided services
Measurements, inspections, sampling
- dumb caliber runs to bottoms
- downhole pressures, temperatures and fluid levels with memory gauges (piezoresistive and quartz)
- downhole minilogging memory tool MLT300 (Canada Tech, ALS Omega Well Monitoring)
- pressures, fluid levels
- thermometry
- CCL (Casing Collar Locator)
- flowmeter – velocity changes in well completion due to scales, velocity profile in pay zones
- radial flowmeter – influx point in ruptured gravel pack filter
- dowhnole memory B&W camera (Omega Well Intervention)
- inspection of scales and sediments
- inspection of well completion defects
- inspection of fallen downhole tool
- cable online downhole pressures and temperatures for flow tests of wells
- wellhead sampling of fluids, gases
- wellhead pressures
- echometer – fluid levels in casing and tubing
Slickline Jobs (with jarring) in 2 3/8”, 2 7/8” a 3 1/2" completions
- settling and pulling of downhole valves in D/X/XN landing nipples
- sliding side door shifting
- downhole perforation (2 7/8” and 3 1/2")
- downhole sediments sampling of fluids, gases
Wireline
We can provide wireline operations through our sister company Karotáž a cementace, s.r.o.
More info HERE.